Project No. | Contract | Tied Projects | Project Description | Work Type | Project Type | Construction Location | Cost to Bid | Bid Opening |
---|---|---|---|---|---|---|---|---|
24-09 | 24-09 | n/a | Oak Shores Park Lift Station #26 & Force Main Installation Project | Sanitary sewer lift station, gravity sewer, hdd sewer, paving & concrete work | The majority of the work includes 730 GPM sanitary sewer lift station, gravity and directional drill sewer improvements, by-pass pumping, bituminous paving, concrete curb and gutter replacement, bituminous trail and ADA ramp placement, structures | Lakeville, MN | 1 credit | Bidding Closed - 10/10/2024 10:30 AM |
24-07B | 24-07B | n/a | Site work for a municipal water well including furnishing and installing: pitless adapter, submersible pump and motor, electrical building. Utility work including: water main installation, hydrant installation, and pre cast structures. Bituminous driveway and trail paving as well as turf establishment site wide. | Site work associated with municipal water well | Site work associated with municipal water well | 1 credit | Bidding Closed - 09/12/2024 10:30 AM | |
24-03 | 24-03 | n/a | Indiana Avenue, Ipava Avenue, and 175th Street West Rehabilitation Project | Street Rehabilitation and Reconstruction | Various pavement rehabilitation methods including full depth reclamation, Mill & Overlay, and trail reconstruction. Utility improvements including watermain bolt replacement, and storm sewer repairs and placement | Lakeville, MN | 1 credit | Bidding Closed - 04/11/2024 10:30 AM |
24-13 | 24-13 | n/a | Surface Sealing Project | Surface Seal | Surface seal of residential streets. | Lakeville, MN | 1 credit | Bidding Closed - 03/27/2024 10:30 AM |
24-01 | 24-01 | n/a | 2024 Miscellaneous Roadway Repairs and Overlays | Bituminous Milling/Reclamation and Paving, Concrete, Storm Sewer | Rehabilitation of residential streets via mill and overlay, full depth reclamation and milling of bituminous parking lots and trails, spot curb and gutter replacement, ADA curb ramp replacement, and storm sewer improvements | Lakeville, MN | 1 credit | Bidding Closed - 02/27/2024 10:30 AM |
24-02, 24-02 | 24-02 | n/a | 2024 Street Reconstruction and Rehabilitation Project | Reconstruct, Rehabilitate, Bituminous, Concrete, Utility | Reconstruction/rehabilitation of collector and residential streets including full depth reclamation, bituminous milling, paving, spot curb and gutter replacement, ADA curb ramp replacement, storm sewer improvements, and hydrant/valve bolt replacements | Lakeville, MN | 1 credit | Bidding Closed - 02/20/2024 10:00 AM |
24-12 | 24-12 | n/a | 2024 CMF Water Tower Rehabilitation Project | Water tower rehabilitation | Complete coating removal and replacement of the interior wet. Partial removal and replacement of the interior dry and exterior coatings, as well as other structural repairs and modifications of the Central Maintenance Facility Water Tower. | Central Maintenance Facility, Lakeville, MN | 1 credit | Bidding Closed - 01/25/2024 10:30 AM |
24-23 | 24-23 | n/a | 2024 Inflow and Infiltration Improvement Project | Sanitary Sewer CIPP lining | Sewer Lining | 1 credit | Bidding Closed - 01/19/2024 10:30 AM | |
24-07A | 24-07A | n/a | The project involves the construction of a municipal water supply well including mobilization and demobilization of all work; drill a test borehole; drill and complete a new 18 diameter municipal water supply well; provide water quality testing of new well; and site restoration. | Municipal Well Drilling | Municipal Well Drilling | 1 credit | Bidding Closed - 12/07/2023 10:30 AM | |
24-77 | 24-77 | n/a | 2024 Water Treatment Chemical Supply | Water Treatment Chemical Supply | 18400 Ipava Ave Lakeville, MN 55044 | 1 credit | Bidding Closed - 11/27/2023 10:30 AM | |
23-99 | 23-99 | n/a | 2023 Well Rehabilitation Project | Municipal Well Rehabilitation | 1 credit | Bidding Closed - 09/26/2023 10:29 AM | ||
23-62 | 23-62 | n/a | Central Maintenance Facility Bunker Reconstruction | Reconstruction of facility bunker | This project will include demolition and removal of existing concrete, curb and bituminous paving. Installation of new cast-in-place concrete foundations and precast T-panels. Bituminous paving and installation of new fabric covered steel framed shelter. | Central Maintenance Facility, Lakeville, MN | 1 credit | Bidding Closed - 09/08/2023 10:30 AM |
22-60 | 22-60 | n/a | Middle Creek Restoration at Dodd Boulevard | 1 credit | Bidding Closed - 06/13/2023 10:30 AM | |||
23-77 | 23-77 | n/a | 2023 Water Treatment Chemical Supply | 0 credits | Bidding Closed - 06/09/2023 10:30 AM | |||
23-23 | 23-23 | n/a | 23-23 2023 Inflow and Infiltration Improvement Project | CIPP lining of 9" VCP | Sanitary Sewer Lining | Valley Park area-Lakeville, MN | 1 credit | Bidding Closed - 04/21/2023 10:30 AM |
23-18 | 23-18 | n/a | 2023 Casperson Park Trails Rehabilitation Project | Bituminous trail reclamation and paving | The project involves trail rehabilitation, widening, and new trail construction along with storm sewer repair, ADA improvements, concrete sidewalk, and permanent turf restoration. | Lakeville, MN | 1 credit | Bidding Closed - 04/07/2023 10:31 AM |
23-59 | 23-59 | n/a | Foxborough Pond Water Quality Improvement Project | Project scope includes pond excavation along with minor clearing and grubbing and storm sewer installation. | Foxborough Park, Lakeville, MN | 1 credit | Bidding Closed - 03/21/2023 10:30 AM | |
23-11 | 23-11 | n/a | 2023 Surface Seal Project | Surface Seal | Surface seal of residential streets. | Lakeville, MN | 1 credit | Bidding Closed - 03/15/2023 10:30 AM |
23-60 | 23-60 | n/a | Southwest Trunk Watermain Improvements | Work includes watermain improvements, pipe jacking, booster station construction | Work includes watermain improvements, pipe jacking, booster station construction, building construction, roadway grading, traffic control, and restoration. | Along 215th Street, under Interstate 35 and along Keokuk Avenue in southwest Lakeville, MN, Dakota County. | 1 credit | Bidding Closed - 03/10/2023 11:00 AM |
23-06 | 23-06 | n/a | City Wide Trail Gap Improvement Project | Trail paving, retaining wall construction, restoration, traffic control striping | Project includes grading and construction of trail segments, including retaining walls, striping, turf establishment, concrete curb | Throughout City of Lakeville | 1 credit | Bidding Closed - 03/10/2023 10:30 AM |
23-01 | 23-01 | n/a | 2023 Miscellaneous Roadway Repairs and Overlays Project | Various street and utility work | concrete concrete curb and gutter replacement, concrete sidewalk and pedestrian ramp replacement, bituminous milling and pavement overlay of residential streets, bituminous parking lot replacement, bituminous trail replacement, storm sewer installation | Lakeville, MN | 1 credit | Bidding Closed - 03/09/2023 10:30 AM |
23-03 | 23-03 | n/a | 205th Street Rehabilitation and Ipava Avenue Roundabout | Full depth reclamation, Mill &Overlay, Underground Utility | Various pavement rehabilitation methods including full depth reclamation, Mill & Overlay, trail and roundabout installation, and utility improvements including watermain replacement, and storm sewer placement | Lakeville, MN | 1 credit | Bidding Closed - 02/24/2023 10:30 AM |
23-02 | 23-02 | n/a | 2023 Street Rehabilitation Project | mill and overlay bituminous pavement, concrete replacement, underground utility | Rehabilitation of collector and residential streets including bituminous milling and paving, spot curb and gutter replacement, ADA curb ramp replacement, storm sewer improvements, and hydrant/valve bolt replacements | Lakeville, MN | 1 credit | Bidding Closed - 02/21/2023 10:00 AM |
23-14 | 23-14 | n/a | 2023 Steve Michaud Park Water Tower Rehabilitation Project | Water tower rehabilitation | Complete coating removal and replacement of the exterior, interior dry and wet areas, as well as other structural repairs and modifications of Steve Michaud Park Water Tower. | Steve Michaud Park - Lakeville, MN | 1 credit | Bidding Closed - 02/07/2023 10:30 AM |
24-04 | 24-04 | n/a | 185th Street Extension & CSAH 23 (Cedar Ave) and 185th Street Intersection Improvements Project | Roadway grading, paving, storm sewer, watermain, sanitary sewer, retaining walls | Roadway Construction, Utility improvements, Retaining walls, Culverts, traffic signals, roundabout, landscaping, irrigation, clearing/grubbing | 185th Street and Highview Avenue in Lakeville, MN | 1 credit | Bidding Closed - 01/13/2023 10:30 AM |
22-99 | 22-99 | n/a | 2022 Submersible Well Rehabilitation Project | Submersible Well Rehabilitation | Rehabilitation of three municipal submersible wells. | Lakeville, MN | 1 credit | Bidding Closed - 11/15/2022 10:30 AM |
23-43 | 23-43 | n/a | North Creek Watershed Improvements at Crystal Lake Golf Club | 1 credit | Bidding Closed - 11/15/2022 10:30 AM | |||
20-62 | 20-62 | n/a | North Creek Channel Improvement Project | 1 credit | Bidding Closed - 09/21/2022 3:00 PM | |||
22-08 | 22-08 | n/a | Ipava Ave and 165th Street W Mill and Overlay Project | Bituminous, Mill and Overlay, Storm Sewer, Concrete Curb and Pedestrian Ramps | Rehabilitation of collector streets including bituminous mill and overlay, bituminous underseal, spot curb and gutter replacement, ADA curb ramp replacement, and storm sewer improvements. | Lakeville, MN | 1 credit | Bidding Closed - 08/04/2022 10:00 AM |
22-24 | 22-24 | n/a | 215th Street Extension, Galway Lane, and 220th Street Improvements | Bituminous, Grading, Storm sewer, sanitary sewer, watermain, precast box culvert | Bituminous, Grading, Storm sewer, sanitary sewer, watermain, precast box culvert, restoration | East of Cedar Avenue, along 215th Street and north of 220th Street in Lakeville, MN Dakota County | 1 credit | Bidding Closed - 07/15/2022 10:30 AM |
22-23 | 22-23 | n/a | 2022 Inflow and Infiltration Improvement Project | Sanitary sewer pipe lining | Lining of vitrified clay and reinforced concrete sanitary sewer pipe | 1 credit | Bidding Closed - 04/22/2022 10:30 AM | |
22-15 | 22-15 | n/a | 2022 Surface Seal Project | Surface Sealing | Application of maltene based rejuvenating agent on local bituminous streets | Lakeville, MN | 1 credit | Bidding Closed - 03/31/2022 10:30 AM |
22-01 | 22-01 | n/a | 2022 Miscellaneous Road Repairs and Overlays | Mill & Overlay, concrete curb & sidewalk, bituminous trail, watermain | Rehabilitation of residential streets, reclamation of residential streets, removal and replacement of concrete curb & gutter, pedestrian curb ramp replacement, watermain removal and replacement, bituminous trail replacement, storm sewer installation | Lakeville, MN | 1 credit | Bidding Closed - 03/10/2022 10:30 AM |
22-02 | 22-02 | n/a | 2022 Street Reconstruction Project | Reconstruct, Bituminous, Concrete, Utility | Reconstruction of minor collector and residential streets including full depth reclamation, bituminous paving, spot curb and gutter replacement, ADA curb ramp replacement, storm sewer improvements, and hydrant/valve bolt replacements | Lakeville, MN | 1 credit | Bidding Closed - 02/23/2022 10:00 AM |
22-13 | 22-13 | n/a | CSAH 70 Trail Connection | Pedestrian bridge, trail paving, pedestrian curb ramp construction | The project includes installation of pedestrian bridges, trail paving, tree removal and pedestrian curb ramp installation | East of Dodd Boulevard, North of CR 70, west of Humboldt Court in Lakeville, MN | 1 credit | Bidding Closed - 02/18/2022 11:00 AM |
22-04 | 22-04 | n/a | Ipava Ave and 192nd St Improvements Project | Full Depth Reclamation, Paving, Concrete Curb and Gutter and walk R & R | Reconstruct including full depth reclamation, paving, spot curb and gutter replacement along with spot concrete walk replacement | Ipava Ave from Kenwood Trail to 192nd St W 192nd St W from Kenwood Trail to Ipava Ave | 1 credit | Bidding Closed - 02/18/2022 10:30 AM |
22-03 | 22-03 | n/a | 210th Street and Lakeville Boulevard Improvements | Roadway, grading, utilities, mill and overlay, full reconstruction, reclamation | Roadway Reconstruction, utility (storm sewer, watermain, sanitary sewer) improvements, widening and urbanizing to include concrete curb and gutter and pedestrian trails, roundabout | 210th Street and Lakeville Boulevard between Kensington Boulevard and Cedar Avenue | 1 credit | Bidding Closed - 01/21/2022 10:30 AM |
20-45 | 20-45 | n/a | 165th Street Water Quality Improvement Project | Stormwater Basin Construction, storm sewer, grading | The project includes stormwater basin construction, common excavation, storm sewer installation, bituminous trail construction, aggregate base and grading, concrete curb and gutter installation and bituminous paving. | 165th Street east of Kenrick Avenue | 1 credit | Bidding Closed - 09/13/2021 3:00 PM |
21-21 | 21-21 | n/a | Glacier Way Improvement Project. The project includes roadway construction, watermain extension, storm sewer installation, concrete sidewalk construction, bituminous trail construction, aggregate base and grading, concrete curb and gutter installation and bituminous paving. | roadway construction, utility improvements, | Glacier Way between 181st St and 179th St | 1 credit | Bidding Closed - 07/23/2021 10:00 AM | |
21-08 | 21-08 | n/a | Well No. 4 Raw Watermain Replacement Project | Watermain Installation, Trail Paving, Restoration | Watermain | Lakeville, MN | 1 credit | Bidding Closed - 05/07/2021 10:30 AM |
20-15 | 20-15 | n/a | Cedar Avenue Trunk Watermain and Pressure Reducing Valve | Watermain installation, Pressure Reducing Valve Installation, Restoration | Watermain installation, Pressure Reducing Valve Installation, Restoration, Trail Patching | 1 credit | Bidding Closed - 04/23/2021 10:30 AM | |
21-12 | 21-12 | n/a | Surface Sealing Project | 1 credit | Bidding Closed - 03/26/2021 10:30 AM | |||
21-18 | 21-18 | n/a | Farmington High School Secondary Access Road | Roadway, Grading, Storm Sewer, Pedestrian Ramp, Erosion Control, Paving, Curb | Roadway, Grading, Storm Sewer, Pedestrian Ramp, Erosion Control, Paving, Curb and Gutter, Trail Paving | 1 credit | Bidding Closed - 03/26/2021 10:30 AM | |
21-01 | 21-01 | n/a | 2021 Miscellaneous Road Repairs and Overlays Project | 1 credit | Bidding Closed - 03/19/2021 10:30 AM | |||
21-03 | 21-03 | n/a | Highview Avenue Improvement Project | 1 credit | Bidding Closed - 03/05/2021 10:30 AM | |||
21-02 | 21-02 | n/a | 2021 Street Rehabilitation Project | Bituminous | Mill and Overlay | Lakeville, MN | 1 credit | Bidding Closed - 02/26/2021 10:30 AM |